Planning a shutdown that finishes on time

Planned shutdowns are short windows with a lot riding on them. The work done weeks before decides whether you start back up on schedule.

SilinX Editorial Team
SilinX GuideFreeze scope early and control late additions.

A shutdown, outage or turnaround is when equipment is stopped on purpose to do work that cannot be done while it runs. The window is fixed and expensive. Overruns cost lost production, and rushed work can cause new problems at startup.

Freeze the scope early

Collect all the work that needs the shutdown well in advance. Review each job: does it really need the equipment stopped? Agree the list and set a date after which new jobs need special approval. Late additions are a top cause of overruns.

Plan each job in detail

For every job, write the steps, the people and skills needed, the parts and tools, the permits and the expected hours. Order parts early and kit them by job so nothing is searched for during the window.

Build the schedule around constraints

Some jobs depend on others; some need the same crane or the same specialist. Map these out so the critical path is clear. Line up contractors early and send them the job details in advance.

Run it day by day

Hold a short meeting at each shift change: what was done, what is late, what is blocked. Track progress against the plan so problems are visible early, while there is still time to recover.

Review after startup

Afterwards, compare plan against actual hours, list what went wrong and what went right, and feed it into the next plan. Every shutdown should be easier than the last.

Key takeaways
  • Freeze scope early and control late additions.
  • Plan and kit every job before the window opens.
  • Map dependencies and shared resources.
  • Track daily and review afterwards.