SilinX
Industry:
SilinX for Manufacturing

Keep lines running and changeovers on time

Plan maintenance around production, catch wear before it stops a line, and start new equipment with a clean baseline.

SilinX
ENTERPRISE ASSET SOLUTION
NORTHFIELD PLANT ▾
Dashboard
Work orders
Preventive
Assets
Inventory
Vendors
Approvals
Repair or Replace
Safety
Startup
Reports

CX-2026-00016 · Packaging line 2 — new install

7 of 9 checks signed
Checklist — from the new install template
✓ Installation matches drawingsSigned · installer
✓ Guards and e-stops testedSigned · safety lead
✓ Spare parts list loaded14 parts
○ Operator training sign-offWaiting
Motor amps12.4 ADesign ≤ 14 A
Vibration1.8 mm/sDesign ≤ 2.8
Bearing temp41 °CDesign ≤ 60
Line speed54 /minDesign 60 — issue logged
On handover, four things happen automatically: asset record created · warranty clock started · PM schedule generated · documents attached.
‹ WO-1048
U4H · EmergencyIn progressAttend: 0h 42m Leak at evaporator drain
Asset is downDowntime clock: 1h 12m
Photo (2)
Parts (1)
1:12:44
Notes
Checklist☑ Lock out power☑ Clear drain line☐ Test with water
Complete this work order

What gets in the way

Unplanned line stops

One failed motor or belt idles a whole shift.

Tribal knowledge

The fix lives in one technician's head.

Messy startups

New equipment goes live with no baseline or PM plan.

How SilinX helps

SilinX
ENTERPRISE ASSET SOLUTION
NORTHFIELD PLANT ▾
Dashboard
Work orders
Preventive
Assets
Inventory
Vendors
Approvals
Repair or Replace
Safety
Startup
Reports

Preventive maintenance

PM compliance 87% · target 90%
Air compressor A — monthly inspectionWindow Nov 1 – Nov 7 · 9 stepsDue this week
All dock doors — lubricationEvery 2 weeks · next Nov 1Creates work order 3 days early
Cooler 2 — coil cleaningEvery quarter · SOP attachedScheduled · Dec 1
Forklift 2 — 250-hour serviceMeter 238 h · due at 250 hNot today — waiting for parts
Readings from the last run — Air compressor A
Discharge pressure
118 psi in range
Motor amp draw
41.7 A over 38 A
Oil temperature
176 °F in range
Out-of-range reading raised WO-1054 automatically.

PM built around run hours

Service by hours or cycles, not just the calendar.

SilinX
ENTERPRISE ASSET SOLUTION
NORTHFIELD PLANT ▾
Dashboard
Work orders
Preventive
Assets
Inventory
Vendors
Approvals
Repair or Replace
Safety
Startup
Reports

CX-2026-00016 · Packaging line 2 — new install

7 of 9 checks signed
Checklist — from the new install template
✓ Installation matches drawingsSigned · installer
✓ Guards and e-stops testedSigned · safety lead
✓ Spare parts list loaded14 parts
○ Operator training sign-offWaiting
Motor amps12.4 ADesign ≤ 14 A
Vibration1.8 mm/sDesign ≤ 2.8
Bearing temp41 °CDesign ≤ 60
Line speed54 /minDesign 60 — issue logged
On handover, four things happen automatically: asset record created · warranty clock started · PM schedule generated · documents attached.

Startup checklists and baselines

Sign-offs and readings recorded before handover.

SilinX
ENTERPRISE ASSET SOLUTION
NORTHFIELD PLANT ▾
Dashboard
Work orders
Preventive
Assets
Inventory
Vendors
Approvals
Repair or Replace
Safety
Startup
Reports

Live condition — CH-002 Cooler 2 compressor

Trending up
Motor vibration, last 30 days · baseline 1.8 mm/s
Readings feed the Repair or Replace answer automatically.Plan the replacement before it fails

Live condition trends

See wear coming from equipment readings.

Equipment teams like yours track in SilinX

ConveyorsMotors & gearboxesCompressorsPackaging machinesRobotsHydraulic pressesChillersBoilers

What each person gets

Maintenance manager

See the whole operation and fix the right things first.

  • Backlog, overdue work and PM completion by site
  • Workload by team
  • Repair-or-replace answers for budget season
Work orders ⊕ New
Mine (6)TeamAll
U4H · EmergencyIn progressWO-1048 — Leak at evaporator drainCooler 2 · Attend: 0h 42m left
U24H · UrgentAssignedWO-1042 — Replace drive beltConveyor 3 · Attend: 6h 10m left
U7D · RoutineCompletedWO-1031 — Replace lobby lampCompleted yesterday
Sorted by time left on the attend clock

Set up your first site this week

7-day free trial · No card needed

Start free trial Read: moving off spreadsheets